Big news… the next chapter is here.
Nearly two months after learning the 9 AM radio show was coming to an end, I can finally share what’s next.
Here’s what’s coming, how you’ll be able to listen, and a little of what’s happening behind the scenes.
Make sure you're signed up to get my email UPDATES!
http://JustinBarclay.com/GoodNews
Get the details on everything coming!
I asked BRAVE search engine this…
when did the planning start for the copperton hign power lines begin in michigan ? and why?
The reply ….
Planning for the Copperton Projects began several years prior to 2026, as part of the Midcontinent Independent System Operator's (MISO) Long-Range Transmission Planning (LRTP) process. The specific segment for Michigan, known as Project 32, was approved by the MISO Board of Directors in December 2024 as part of the larger LRTP Tranche 2.1.
The planning was initiated to address several critical grid needs:
Grid Reliability and Resilience: To strengthen the electric transmission system, reduce the risk of blackouts, and improve resilience against extreme weather.
Renewable Energy Integration: To enable the integration of cheaper renewable energy sources, such as wind and solar, which are currently hindered by transmission limitations.
Growing Demand: To accommodate increasing electricity demand driven by factors such as data center development, electric vehicle ...
Toyota is the most MAGA car company in the world.
see the full list of stories Justin is looking at today when you join the Freedom Fam VIP in the SECRET SHOW PREP